SAG AND VERTICAL MILL(4500 SERIES)INSTALLATION

Group five projects has contracted Degbed for the installation of 20X 13.5 sag mill and 4500 series vertical mill on the Natougou Gold project. The mills were manufactured by Metso Minerals. all installations were done with adherence to Metso Internationals Standards .The project is still on going and is expected to be commissioned and handed […]

MILL UPGRADE FOR ANGLOGOLD GHANA LIMITED

We have successfully completed the mill upgrade contracted by Outotec Ghana for Anglogold Ghana Limited. This was 1296 LTI free upgrade. We changed the drive train gearbox and its base plates and new ones were installed. Two broken hold down bolts were core drilled and new ones installed . A new pinion and its base […]

GEARBOX REPAIR WORKS AT ASANKO GOLD MINES

Asanko mines have engaged us on repair works for their sag and ball mills, this comprises swapping of the gearboxes and installation of a new motor for the mill. In addition we also carried out a drive train alignment on both mills, the repair works was completed within 79 hours.

BROKEN PINION CHANGE FOR ASANKO GOLD

Degbed has been given the green light to change a broken pinion on the sag and ball mill at Asanko mines.As usual the team was able to work within the time frame to the satisfaction of the client.

REDIS CONTRACTS DEGBED

Degbed Company limited has been contracted by Redis Construction Limited on the Obotan Gold Project to install 8.6m and 5.8m sag mills. Our noble team of workers are working very hard to get the project executed within the stipulated time given us.